Below is a chronological list of the Agency’s official outgoing communications. Primarily, these are comments and submissions that the Agency has sent to the Wek’èezhìi Land and Water Board. You will also find in this archive information we have sent to our Society Members, and letters to Dominion Diamond Mines ULC.
2019 Agency Outgoing Correspondence
- 2019-01-17 — Agency Comments – Response Plans: Fish Version 1.2, Phosphorus Version 1.3, and Chloride Version 1.2
- 2019-01-30 — Agency Comments – Jay AEMP Design Plan
- 2019-03-06 — Agency Comments – Interim Closure and Reclamation Plan, Version 3.0
- 2019-03-26 — Agency Comments – Cujo Outflow Special Design Study
2018 Agency Outgoing Correspondence
- 2018-02-23 — Agency Letter – Engagement Plan version 4.0
- 2018-02-23 — Agency Letter – Jay Co-Placement Study Design
- 2018-03-21 — Agency Comments – Misery Underground Development – Draft Water License and Draft Land Use Permit
- 2018-04-09 — IEMA Closing Arguments – Potassium EQC Amendment Application
- 2018-04-16 — Agency Comments – 2017 ICRP Progress Report
- 2018-04-27 — Agency Letter – WLWB Information Request
- 2018-05-17 — Agency Letter – Sable Diffuser Construction Plan
- 2018-06-30 — Agency Comments – Wildlife Management and Monitoring Plan (WMMP) Process and Guideline Requirements
- 2018-07-10 — Agency Letter – 2017 Environmental Agreement & Water Licence Annual Report
- 2018-07-18 — Agency Comments – Guideline for Hydrocarbon Contaminated Soil Treatment Facilities in the Northwest Territories
- 2018-12-07 — Agency Comments – Potassium Toxicity Study Design & Potassium RP 2.0
2017 Agency Outgoing Correspondence
- 2017-01-11 — Agency Letter to GNWT-ENR on 2016 EIR – Final Review Comments
- 2017-01-13 — Agency Letter to DDEC on Support for the ‘Towards Sustainable Mining Environment Excellence Awards’ – Waste Management Program
- 2017-01-13 — Agency Letter to WLWB on Sable and Two Rock Lake Withdrawal Limits Amendment Application
- 2017-01-19 — Agency Letter to WLWB on Waste Rock and Ore Management Plan v6.2 – Request for Extension
- 2017-01-26 — Agency Letter to WLWB on Waste Rock and Ore Management Plan v6.2 – Proposed Raise of Misery Waste Rock Pile
- 2017-02-13 — Agency Letter to WLWB on Sable Drawdown Limits
- 2017-02-14 — Agency Letter to WLWB on Waste Rock Storage Area Closure Ecological Risk Assessment – Agency Review
- Attachment: Review of Ekati Closure Ecological Risk Assessment
- 2017-04-21 — Agency Letter to WLWB on 2016 Closure and Reclamation Progress Report
- 2017-05-29 — Agency letter KIA on Proposed Changes to the Environmental Agreement for Ekati Diamond Mine
- 2017-05-29 — Agency Letter to LKDFN on Proposed Changes to the Environmental Agreement for Ekati Diamond Mine
- 2017-05-29 — Agency letter to NSMA on Proposed Changes to the Environmental Agreement for Ekati Diamond Mine
- 2017-05-29 — Agency letter to Tlicho Government, on Proposed Changes to the Environmental Agreement for Ekati Diamond Mine
- 2017-05-29 — Agency letter to YKDFN on Proposed Changes to the Environmental Agreement for Ekati Diamond Mine
- 2017-05-31 — Agency letter to WLWB on Cultural Camp Land User Permit Application
- 2017-05-31 — Agency letter to WLWB on Sable WAste Rock Storage Area Design Plan
- 2017-07-07 — Agency letter to GNWT ENR on 2016 Environmental Agreement and Water Licence Annual Report and Summary Report
- 2017-07-07 — Agency to WLWB on Ekati 2016 Aquatic Effects Monitoring Program Annual Report
- 2017-07-10 — Agency letter to ECCC on Proposed Changes to Metal Mine Effluent Regulations (MMER)
- 2017-08-08 — Agency letter to WLWB on DDEC Waste Rock and Ore Management (WROMP) Version 7.0
- 2017-08-10 — Agency Letter to WLWB, DDEC’s 2016 Waste Rock and Waste Rock Storage Area Seepage Survey
- 2017-09-26 — Agency Letter to WLWB, Re: DDEC letter regarding the Agency’s comments on the WROMP 7.0 – Pigeon Expansion
- 2017-10-05 — Agency Letter to GNWT ENR and INAC on Changes to the Ekati Environmental Agreement
- 2017-10-18 — Agency Letter to WLWB on DDEC’s Sable Aquatic Effects Monitoring Program (AEMP) Design Plan and Aquatic Response Framework version 2.0
- 2017-11-22 — Agency Letter to WLWB on Aquatic Response Framework Response Plans – Selenium, Fish, Nitrogen and Potassium
2016 Agency Outgoing Correspondence
- 2016-01-26 — Agency Letter to DDEC on Letter of Support for the Towards Sustainable Mining Environment Excellence Award, Waste Management Program
- 2016-01-26 — Agency Letter to Society Members, Agency’s new Executive Director
- 2016-01-28 — Agency Letter to WLWB on Agency Comments on Sable AEMP Design Plan
- 2016-02-16 — Agency Letter to DDEC on Request for Additional Funds
- 2016-06-01 — Agency Letter to WLWB on Review of AEMP Re-evaluation/Re-Design – All Stakeholders Discussion
- 2016-06-17 — Agency letter to WLWB on Agency Comments on the Phosphate Response Plan
- 2016-06-17 — Agency Letter to WLWB on Agency Comments on the Fish Response Plan
- 2016-06-17 — Agency Letter to WLWB on Agency Comments on Dissolved Oxygen Response Plan
- 2016-06-17 — Agency Letter to WLWB on Agency Comments on Community Composition Response Plan
- 2016-06-17 — Agency Letter to WLWB on Agency Comments on the Chloride Response Plan
- 2016-06-24 — Agency Letter to MVLWB on Review of MVLWB’s Guidelines for Effluent Mixing Zones
- 2016-06-30 — Agency Letter to WLWB on Jay Project Early Works LUP Application
- 2016-07-05 — Agency Letter to DDEC on Ekati WEMP and CRMP Review
- 2016-07-08 — Agency Letter to GNWT on 2015 EA and WL Annual Report and Summary Report
- 2016-07-29 — Agency Letter to DDEC on 2016 Conceptual AQEMMP for the Jay Project
- 2016-08-03 — Agency Letter to WLWB on Jay Project Water License and Land Use Permit Application
- 2016-08-11 — Agency Letter to DDEC on 2016 EIR – Information for the EIR technical session
- 2016-09-15 — Agency Letter to WLWB on DDEC’s 2015 AEMP Re-Evaluation Report
- 2016-10-14 — Agency Response to Information Requests for Jay Project Water License Application
- 2016-10-18 — Agency Letter to WLWB on Sable AEMP Design Plan Version 1.1.
- 2016-12-09 — Agency Letter to WLWB on Jay Early Works Road Construction Plan
2015 Agency Outgoing Correspondence
- 2015-01-06 – Agency Comments on DDEC’s 2014 Final Lac de Gras Regional Grizzly Bear DNA Report and 2013 WEMP Addendum
- 2015-01-16 – Agency Comment on the Lynx Project and the Ekati AEMP
- 2015-01-28 – Agency Submission to GNWT on Environmental Agreement Financial Security – Article IV
- 2015-01-28 – Attachment: Agency Financial Requirements 2015-2060
- 2015-01-29 – Letter of support for Towards Sustainable Mining Environment Excellent Awards – Grizzly Bear DNA Program
- 2015-01-30 – IEMA Comment on WWHPP and WEMP Guidelines
- 2015-01-30 – Attachment: IEMA Comment Table – WWHPP and WEMP
- 2015-01-30 – Additional Comment on the AEMP Design Plan Update for Lynx Project–Monitoring of Fugitive Dust Effects from Lynx Project
- 2015-02-13 – Agency Covering Letter for Jay Project Information Requests
- 2015-02-13 – Jay Project IEMA Information Requests
- 2015-03-02 – Agency Letter on 2014 ICRP Progress Report
- 2015-03-02 – Attachment: Agency Comment Table for 2014 ICRP Progress Report
- 2015-03-16 – Agency Letter on Final Steps in Ekati Environmental Agreement Security Deposit
- 2015-05-21 – Agency Letter on Fisheries Act Review of Proposed Lynx Project
- 2015-06-01 – Agency Comment Letter on 2014 AQMP Report
- 2015-06-01 – Agency Comments on the Ekati Potassium Response Plan (Version 1.0)
- 2015-06-04 – Agency Comments on Ekati Waste Rock Storage Area Risk Framework
- 2015-06-05 – Covering Letter on Jay Project Second Round Information Requests
- 2015-06-05 – Agency Jay Project Second Round Information Requests
- 2015-07-14 – Agency Letter to Aboriginal Society Members on Proposed Environmental Agreement Changes
- 2015-07-20 – Agency Letter on Lynx Project Land Lease Applications
- 2015-07-22 – Agency Comment Table for 2014 AEMP Report
- 2015-07-30 – IEMA Jay Project Technical Report
- 2015-09-23 – Agency Comments on Ekati Potassium SSWQO Submission
- 2015-09-24 – Agency Letter of Support for CIMP Zooplankton Study
- 2015-09-28 – Agency Response to Jay Project Public Hearing Undertaking #9
- 2015-10-09 – Agency Letter on Environmental Agreement Security Deposit (October 2015)
- 2015-10-19 – IEMA Jay Project Closing Submission
- 2015-10-19 – Notice and Invitation to the Annual General Meeting of the Independent Environmental Monitoring Agency
- 2015-12-14 – Agency Letter to DDEC on Request for Additional Funds
2014 Agency Outgoing Correspondence
- 2014-01-14 – Agency to WLWB, Intervention on Ekati Lynx Project Water Licence WL 2013L2-0001 and LUP W2013D0006
- 2014-01-21 – Agency Letter to Minister of ENR Michael Miltenberger, Financial Security Gap for Closure
- 2014-02-05 – Agency to WLWB, Comments on the Pigeon Waste Rock Pile Design
- 2014-02-07 – Agency to WLWB, Chris Burn Comments on the Pigeon Waste Rock Pile Design
- 2014-02-10 – Agency to MVEIRB, Comments on Jay Cardinal Project Draft Terms of Reference
- 2014-03-03 – Agency to WLWB, Comments on Draft Lynx Land Use Permit and Draft Water Licence.
- 2014-03-05 – Agency Letter to WLWB and DDEC, 2013 Annual ICRP Progress Report
- 2014-03-05 – Agency to WLWB and DDEC, Comments on the 2013 ICRP Progress Report
- 2014-03-05 – Agency Letter to WLWB and DDEC, Improvements to Ekati Fish Sampling
- 2014-03-17 – Agency Letter to Society Members, Notice of Special Meeting
- 2014-03-17 – Agency Letter to AANDC, ENR and DDEC, Proposed Changes to the Ekati Environmental Agreement
- 2014-03-25 – Agency Letter to AANDC, ENR and DDEC, Follow-up to Special Meeting of the Society Members on Changes to the Environmental Agreemment
- 2014-04-03 – Agency Letter to YKDFN, Thank You for Agency Community Visit
- 2014-04-08 – Agency to WLWB, Comments DDEC’s Community Engagement Plan
- 2014-04-17 – Agency Letter to WLWB, Comments on Ekati Nitrogen Response Plan
- 2014-04-17 – Attachment: Comment Table on Ekati Nitrogen Response Plan
- 2014-05-20 – Agency Letter to WLWB, Comments on the Aquatic Response Framework
- 2014-05-20 – Attachment: Agency Comment Table on Aquatic Response Framework
- 2014-06-18 – Agency to WLWB, Comments on Misery Powerlines
- 2014-05-28 – Agency to WLWB, Comments on Ekati Waste Management Plan
- 2014-06-25 – Agency Letter to DDEC, Thank You for Recent Site Visit.
- 2014-07-02 – Agency Letter to MVEIRB, Agency Comments on Amendments to the Jay Project (EA 1314-01)
- 2014-07-02 – Attachment: Agency Comments on Amendments to the Jay Project (EA 1314-01)
- 2014-07-18 – Agency Letter to DDEC, Plans For and Design of Dust Supression Study at Ekati Mine
- 2014-07-21 – Agency Letter to ENR, Agency Comments on DDEC’s 2013 Annual Report
- 2014-08-01 – Agency Letter to WLWB, Comments on Misery Power Line Additional Information (W2014001)
- 2014-08-01 – Attachment: Agency Comments on additional Information on Misery Power Line
- 2014-08-06 – Agency Letter to DDEC and GNWT, Financial Security Under the Ekati Environmental Agreement
- 2014-09-29 – Agency Letter to WLWB, Agency Comments on Ekati Mine Water Licence Amendment – Part C Security
- 2014-10-14 – Agency Letter to Society Members, Notice of Annual General Meeting of the Independent Environmental Monitoring Agency, December 4 2014
- 2014-10-14 – Agency Comments on 2013 ICRP Progress Report Supplemental Information
- 2014-10-27 – Agency Comments on 2015 Work Plan for Exploration at Ekati
- 2014-10-01 – Agency Letter to GNWT, DDEC, Agency Proposal for Ekati Environmental Agreement Financial Security
- 2014 -10-16 – Agency Letter to GNWT, DDEC, Agency Proposal for Ekati Environmental Agreement Financial Security (revised October 16, 2014)
- 2014-12-19 – Agency Letter to WLWB on Aquatic Response Framework Version 1.1
- 2014-12-19 – Attachment: Comment Table – Aquatic Response Framework Version 1.1
2013 Agency Outgoing Correspondence
- 2013-02-05 – Agency Letter to WLWB re: Ekati’s ICRP progress report
- 2013-02-27 – Agency to WLWB, Closing Comments – Water Licence Renewal
- 2013-04-09 – Agency to WLWB, Comment Table for draft Water Licence Renewal
- 2013-04-30 – Agency Letter to WLWB, Reclamation Security Estimate
- 2013-04-30 – Attachment: Reclamation Security Estimate
- 2013-06-14 – Agency to WLWB, Comments on DDEC’s 2012 AEMP
- 2013-06-28 – Agency to WLWB, Comments on the 2012 Seepage Report
- 2013-07-09 – Agency Letter to ENR Minister Michael Miltenberger, Nominations to the WLWB
- 2013-07-16 – Agency Letter to ENR, Zone of Influence Requirement for Caribou Monitoring
- 2013-08-12 – Agency Letter to AANDC, Ekati Financial Security
- 2013-08-14 – Agency Letter to AANDC, 2012 DDEC Annual Report
- 2013-10-08 – Agency to WLWB, Comments on LUP Application W2013C0005 Ekati Exploration
- 2013-10-24 – Agency to WLWB, Lynx Application Comments, Covering Letter
- 2014-10-24 – Agency to WLWB, Lynx Application Comment Table
- 2013-11-20 – Agency to WLWB, Comments on Proposed Developments of the Jay-Cardinal Project W2013D0007 and W2013L2-0002
- 2013-11-25 – Joint Agency Letter to GNWT and AANDC on Devolution and the Environmental Agreements
2012 Agency Outgoing Correspondence
- 2012-01-18 – Agency to BHPB, ENR, AANDC re: 2011 Workshop on Traditional Knowledge
- 2012-01-18 – Attachment – TK Workshop Summary of Discussion
- 2012-01-31 – Agency to GNWT re: Grizzly Bear Monitoring
- 2012-02-27 – Agency to WLWB re: 2012 Fish Sampling Proposal
- 2012-02-27 – Attachment – Fish Sampling Program Comment Table (Microsoft Excel)
- 2012-03-30 – Agency to WLWB re: Agency Comments on WROMP
- 2012-03-30 – Attachment – Agency Comments on WROMP (Microsoft Excel)
- 2012-04-27 – Agency to LWB of MV re Draft Community Engagement Policy and Guidelines
- 2012-05-17 – Agency to BHPB re Grizzly Bear Hair Snagging Program
- 2012-06-13 – Agency to WLWB and BHPB re: 2011 AEMP
- 2012-06-13 – Attachment – Agency Comments on 2011 AEMP
- 2012-06-22 – Agency to BHPB re: BBCI Wildlife Research Permit Application
- 2012-07-03 – Agency to AANDC re AANDC Inspection Capacity
- 2012-07-25 – Agency to WLWB re Water Licence Renewal Preliminary Screening Exemption
- 2012-08-30 – Agency to WLWB re: WPKMP v. 3
- 2012-08-30 – Attachment – Agency Comments re WPKMP v.3
- 2012-09-11 – Agency to Chief Alfonz Nitsiza re Whati Visit
- 2012-09-24 – Agency Comments on Ekati Water Licence Renewal Application
- 2012-09-24 – Agency to BHPB re: Early Adption of the Proposed Nitrate SSWQO at Ekati
- 2012-09-24 – Attachment – Agency Water Licence Renewal Comment Table
- 2012-09-26 – Agency to Chief Alfonz Nitsiza re: Visit to Whati
- 2012-09-26 – Agency to SAO of Whati re: Visit to Whati
- 2012-11-02 – Agency to Society Members re: 2012 AGM invitation
- 2012-11-29 – Agency to AANDC re: 2011 BHPB Annual Report and 2012 EIR
- 2012-12-11 – Agency to BHPB, ENR, AANDC re: Whati Community Concerns
- 2012-12-21 – Agency to WLWB re: Intervention – Renewal of Water Licence
2011 Agency Outgoing Correspondence
- 2011-01-07 – Agency email to WLWB re: BHPB Modification Request – Misery Waste Rock Pile
- 2011-01-10 – Agency to BHPB, ENR, DIAND re: Highlights from 2010 Environmental Workshop
- 2011-01-12 – Agency to WLWB re: Conformity Check of the WPKMP
- 2011-01-25 – Agency to BHPB re: 2008-09 Fay Bay Spill Monitoring Report
- 2011-01-25 – Agency to DIAND, ENR, WLWB, BHPB re: Community Capacity for Mine Closure Planning
- 2011-02-15 – Agency to Society Members re: ICRP Decision
- 2011-02-22 – Agency to Kitikmeot Inuit Association
- 2011-02-22 – Agency to Kugluktuk Mayor
- 2011-04-12 – Agency Thank You to KIA President
- 2011-04-12 – Agency Thank You to Kugluktuk Mayor
- 2011-04-14 – Agency to BHPB re: Wildlife Monitoring
- 2011-05-02 – Agency to ENR Minister re: Wildlife Act
- 2011-07-11 – Agency to BHPB re: Use of Nitrate IPS in Ekati Water Mngt
- 2011-07-19 – Agency to WLWB re: Adaptive Management Plan for Ekati
- 2011-09-08 – Agency to DIAND re: BHPB 2010 Annual Report
- 2011-10-03 – Agency cover email to WLWB re: Comments on Draft Closure and Reclamation Guidelines
- 2011-10-03 – Attachment – Draft Closure and Reclamation Guidelines – Agency Comments (undated)
- 2011-11-16 – Agency to WLWB re: Agency Comments on 2011 WPKMP
- 2011-11-16 – Attachment – 2011 WPKMP Table
2010 Agency Outgoing Correspondence
- 2010-02-17 – Agency, EMAB, SLEMA Joint Letter to WLWB re: Caribou Monitoring
- 2010-03-26 – Agency covering email re: Agency Comments on Updated WPKMP
- 2010-03-26 – Attachment – WPKMP Update Comments from IEMA (undated)
- 2010-04-28 – Agency to DIAND re: BHPB EIR 2009 Close-out Report and Technical Addendum
- 2010-05-17 – Agency to BHPB re: Nitrate IPS in Ekati Water Management
- 2010-05-31 – Agency to BHPB re: Comments on 2009 WEMP Report
- 2010-07-15 – Agency to WLWB re: Comments on Draft MVLWB Water Policy
- 2010-07-26 – Agency to WLWB re: Intervention on ICRP
- 2010-10-04 – Agency to DIAND re: Comments on 2009 Ekati Annual Report
- 2010-10-20 – Agency to BHPB Re Transfer of Contributed Services
- 2010-10-20 – Agency to BHPB re: Agency Working Capital Deficit
- 2010-11-03 – Agency cover e-mail re: Peer Review of PDC 10-Year Summary Report
- 2010-11-03 – Attachment – BHPB to Agency re: Agency Review of PDC (Nov. 2, 2010)
- 2010-11-03 – Attachment – Peer Review of 10-Year PDC Monitoring Program Report (June 25, 2010)
- 2010-11-25 – Agency to BHPB HSEC re: BHPB Participation in AQMP Workshop
- 2010-12-16 – Agency to BHPB HSEC re: Ekati Widlife Monitoring and Managment
- 2010-12-20 – Agency to WLWB re: Response Framework for Aquatic Effects Monitoring
2009 Agency Outgoing Correspondence
- 2009-01-20 – Agency Letter to WLWB re: Updated ICRP
- 2009-01-27 – Agency Letter to WLWB re use of Beartooth Pit as Minewater Sump
- 2009-02-12 – Agency Letter to WLWB re: ICRP Verification Comments
- 2009-02-13 – Agency Intervention re Sable Pigeon Beartooth Public Hearing
- 2009-02-17 – Agency Letter re: 2008 Environmental Workshop
- 2009-03-17 – Agency Letter to BHPB on Changes to 2009 WEMP
- 2009-03-20 – Agency Letter to BHPB and Diavik on 2009 Caribou Monitoring
- 2009-05-14 – Agency Letter to Society Members re: External Review
- 2009-05-18 – Agency Letter to WLWB re: Draft Amalgamated Licence
- 2009-05-21 – Agency Letter to WLWB Requesting Extension to Reply to BHPB Motion
- 2009-05-5 – Agency ICRP Intervention for Public Hearing
- 2009-06-24 – Submission of the Agency in Response to BHPB Motion
- 2009-07-22 – Agency to WLWB on Draft Closure & Reclamation Preparation Guidelines
- 2009-07-24 – Agency to WLWB re Agency Review of 2008 AEMP
- 2009-09-22 – Agency to Distribution for Annual Report
- 2009-10-14 – Agency Letter to INAC on BHP EIR
- 2009-10-15 – Agency Notice to Society Members re Annual General Meeting
- 2009-10-16 – Agency Letter to Chief Chocolate
- 2009-10-19 – Agency to Akaitcho Treaty 8 BHPB IBA Office re: Environmental Info Sessions
- 2009-10-20 – Agency Letter to WLWB on ICRP Revisions
- 2009-12-02 – Joint Letter to BHP, Diavik, DeBeers, ENR re: Wildlife Monitoring Workshop
- 2009-12-11 – Agency to BHP, Diavik, DeBeers, ENR re: Wildlife Monitoring Program Review
- 2009-12-16 – Agency to WLWB re: Comments on Draft Guidelines for Waste Management
2008 Agency Outgoing Correspondence
- 2008-01-07 – Agency letter to Society Members re: Environmental Workshop comments
- 2008-01-28 – Agency letter to WLWB re ICRP section 3
- 2008-02-08 – Agency letter to EA signatories re 5-year review
- 2008-02-25 – Agency letter to BHPB re Sable, Pigeon and Beartooth licence renewal
- 2008-03-26 – Agency letter to WLWB re date for ICRP section 4 working group meeting
- 2008-03-30 – Agency letter to WLWB re watershed adaptive management plan
- 2008-04-04 – Agency ICRP Section 4 Comment Table (Microsoft Word)
- 2008-04-04 – Agency Letter to WLWB re Section 4 ICRP
- 2008-04-23 – Agency letter to WLWB re water licence amalgamation
- 2008-06-04 – Agency Section 4 Interim Closure and Reclamation Plan verification comments
- 2008-06-09 – Agency review of the Watershed Adaptive Management Plan cover letter
- 2008-06-18 – Agency comments on 2007 AEMP
- 2008-06-18 – Agency comments on LLCF water quality model
- 2008-06-18 – Agency comments on water licence amalgamation
- 2008-06-18 – Agency letter to BHPB re 2007 WEMP
- 2008-08-06 – Agency letter to WLWB on Sable, Pigeon and Beartooth water licence renewal
- 2008-08-07 – Agency comments on reclamation research plan
- 2008-09-25 – Agency letter to DIAND re 2007 annual environmental report
- 2008-10-01 – Agency response to ICRP survey from the WLWB
- 2008-10-09 – Agency letter to BHPB re Air Quality Monitoring Plan revisions
- 2008-10-09 – Agency Lutsel K’e visit follow up letter
- 2008-10-15 – Agency Letter to BHPB re LLCF Water Quality Model
- 2008-12-16 – Agency Letter to DIAND re AEMP Guidelines
- 2008-12-16 – Agency Letter to DIAND re McCrank Report
- 2008-12-19 – Agency Letter to DIAND re: Water Quality Standards
2007 Agency Outgoing Correspondence
- 2007-01-25 – Agency letter to society members re annual report responses to recommendations
- 2007-01-31 – Agency letter to WLWB re geochemical characterization & metal leaching mngt plan
- 2007-02-08 – Agency letter to WLWB on AEMP 2007-09
- 2007-03 – SENES review of 2005 AQMP CALPUFF Air Dispersion Modelling Assessment for Ekati
- 2007-03-14 – Agency letter to WLWB re ICRP comments on section 1
- 2007-04-03 – Monitoring agencies review of caribou monitoring programs
- 2007-04-27 – Agency letter to WLWB re Option C approach for structure of ICRP objectives
- 2007-05-09 – Agency letter to WLWB re ICRP verifiication comments
- 2007-07-27 – Agency letter to WLWB re ICRP section 2
- 2007-08-02 – Agency letter to BHPB re air quality monitoring
- 2007-08-03 – Agency letter to WLWB re AEMP sampling reduction
- 2007-08-30 – Agency to WLWB re ICRP summary table
- 2007-10-04 – Agency letter to WLWB re ICRP section 2 verification comments
- 2007-10-05 – Agency comments to BHPB regarding its Environmental Annual Report
- 2007-10-05 – Agency comments to DIAND re BHPB annual environmental report
- 2007-10-19 – Agency comments to BHPB re WPKMP
- 2007-11-16 – Agency letter to WLWB re waste rock pile expansion
- 2007-11-19 – Agency letter to BHPB re ICRP section 3
- 2007-11-27 – Agency letter to BHPB re AEMP and WEMP
2006 Agency Outgoing Correspondence
- 2006-02-15 – Agency to MVLWB on draft ToR for ICRP
- 2006-02-15 – Agency to WLWB re comments on Pit Lake study Task 1 and 2
- 2006-02-17 – Agency to BHPB re Wolverine Skirting
- 2006-02-17 – Agency to EA Signatories re Director replacement
- 2006-03-13 – Agency to DIAND re participant funding
- 2006-03-24 – Agency to BHPB re Annuan Environmental Report
- 2006-03-31 – Agency to BHPB re Closure and Reclamation
- 2006-03-31 – Agency toWLWB re small diamond recovery
- 2006-04-07 – Agency to WLWB re waste rock seepage report
- 2006-04-18 – Agency to WLWB on revised ToR for ICRP
- 2006-04-28 – Agency to DIAND re Ekati Inspections
- 2006-05-05 – Agency to WLWB re WPKMP
- 2006-05-08 – Agency to BHPB re air quality monitoring at Ekati
- 2006-06-16 – Agency to WLWB re chloride addition to For ore
- 2006-06-23 – Agency to DIAND re Environmental Impact Report
- 2006-06-26 – Agency to WLWB re additional chloride information
- 2006-08-04 – Agency to BHPB re comments on closure options workshop
- 2006-08-09 – Agency to DIAND re Agency comments on BHPB 2005 environmental report
- 2006-09-01 – Agency to NSMA on comment distribution prior to regulatory timelines
- 2006-09-26 – Agency AGM invitation
- 2006-10-18 – Agency on BHPB reply to 2005 seepage report comments
- 2006-10-24 – Agency to BHPB re adaptive management plan
- 2006-10-25 – Agency to BHPB re deposition of minewater into cell d of LLCF
- 2006-10-31 – Agency to BHPB with response to BHPB closure objectives
- 2006-11-20 – Agency to WRRB re Bathurst Herd
- 2006-12-15 – Agency to BHPB re AEMP re-evaluation
- 2006-12-15 – Agency to WLWB re Road Watering
2005 Agency Outgoing Correspondence
- 2005-01-14 – Agency to MVLWB, Society Members re Amendment to the term of water licence N7L2-1616
- 2005-02-07 – Agency to BHPB re supplemental funding request
- 2005-02-10 – Agency to BHPB re Agency workplan and core budget 2005-2007
- 2005-02-14 – Agency to MVEIRB w/ comments on MVEIRB Traditional Knowledge guidelines
- 2005-02-18 – Agency Invitation to Agency hosted Ekati workshops
- 2005-02-25 – Agency to BHPB re response to IEMA funding request
- 2005-03-01 – Agency comments on BHPB pit lake study terms of reference – Sarah Baines (MVLWB)
- 2005-03-31 – Agency to DIAND, GNWT re Workshop on cumulative effects on wildlife in Slave Geological Province
- 2005-04-08 – Agency to IACT, Society Members re Recommendations from Agency workshop, March 2005
- 2005-05-04 – Agency to EA Signatories re: Agency comments on budget dispute resolution
- 2005-06-17 – Agency comments on draft 3 of BHPB water licence MV2003L2-0013 – MVLWB, Society Members
- 2005-07-13 – Agency to GNWT re Continuing committment to caribou research and monitoring
- 2005-08-05 – Agency to DIAND re Mine Site reclamation guidelines for NWT
- 2005-09-12 – Agency to BHPB re: waste rock seepage – David Scott (BHPB)
- 2005-09-12 – Agency to BHPB re: waste rock seepage consultant report – David Scott (BHPB)
- 2005-09-26 – Agency to Society Members re Notice of Annual general meeting
- 2005-09-29 – Agency to EA Signatories re: Dispute resolution process for Agency core budget and workplan
- 2005-10-05 – Agency to BHPB re: 2006 environmental impact report – David Scott (BHPB)
- 2005-11-08 – Agency to Distribution List with Agency AGM 2005 meeting summary
- 2005-11-09 – Agency to BHPB regarding closure planning process – David Scott (BHPB), Society Members
- 2005-11-09 – Agency to BHPB regarding closure planning process Attachment – David Scott (BHPB), Society Members
2004 Agency Outgoing Correspondence
- 2004-02-02 – Agency to BHPB, Society Members re – Budget of the Independent Environmental Monitoring Agency
- 2004-02-02 – Agency to BHPB, Society Members, IACT re Cancellation of Ekati Environmental Workshops
- 2004-02-02 – Agency to MVLWB re BHP Request for Exemption from Preliminary Screening for Renewal Application of Water Licence N7L2-1616
- 2004-02-18 – Agency to Distribution List re Invitation to BHPB environmental workshops hosted by the MVLWB and IEMA
- 2004-02-18 – Agency to EMAB w/ request for enhanced inter-agency communication and invitation for a joint EMAB-IEMA Board Meeting
- 2004-03-24 – Agency to MVLWB w/ Comments on the Type A Ekati water licence (MV2003L2-0013) renewal
- 2004-04-13 – Agency to DIAND, BHPB re Recommendations from the Environmental Workshop hosted by IEMA March 16th & 17th, 2004
- 2004-04-19 – Agency to BHPB re Rescan February 2004 Proposal to Update Ekati Air Dispersion Model
- 2004-04-19 – Agency to BHPB re SENES Consultants Ltd. Peer Review of Proposed Update to Ekati Mine’s Air Dispersion Modeling Assessment
- 2004-05-05 – Agency to MVLWB re BHPB April 2004 Abandonment and Reclamation Plan
- 2004-05-14 – Agency to MVLWB, DIAND re BHPB’s 2003 Abandonment and Reclamation Plan, Ekati Mine
- 2004-05-18 – Agency to MVLWB re BHPB application for Renewal of Water Licence MV2003L2-0013 (formerly N7L2-1616) – Agency intervention letter
- 2004-06-23 – Agency to MVLWB, Society Members re Agency comments on BHPB’s 2003 Waste Rock Report consultant report
- 2004-06-23 – Agency to MVLWB, Society Members re Agency Comments on BHPB’s 2003 Waste Rock Report letter
- 2004-07-23 – Agency to MVLWB, Society Members re Ekati Abandonment and Reclamation Plan (A&R Plan) and Security- MV2003L2-0013
- 2004-09-09 – Agency to DIAND, GNWT re Outstanding budget issue
- 2004-09-10 – Steering Committee c/o Agency to BHPB, MVLWB re Focussed Independent Review of Select Parameters of Ekati’s AEMP
- 2004-09-29 – Agency to BHPB, DIAND, GNWT, Society Members re Proposal to participate in monitoring activities of the LLCF
- 2004-09-30 – Agency to DIAND re Comments on Mine Reclamation Guidelines – David Livingstone (DIAND), Society Members, EMAB
- 2004-09-30 – Agency to DIAND, Society Members, EMAB re Agency suggestions for changes to the draft text
- 2004-09-30 – Agency to Environment Canada re Agency request for Environment Canada to review BHPB nitrate toxicity study
- 2004-10-04 – Agency to Society Members re Invitation to 2003-04 Annual General Meeting
- 2004-10-28 – Agency to BHPB re Agency budget
- 2004-11-18 – Agency to DIAND, GNWT re Resolution of outstanding budget related issues of IEMA
- 2004-12-03 – Agency to DIAND re appointment of Dr. Ward Wilson to IEMA Board of Directors – Bob Overvold (DIAND)
- 2004-12-03 – Agency to MVLWB re draft 2 of water licence MV2003L2-0013 – Stephen Nielson (MVLWB)
- 2004-12-14 – Agency to MVLWB re BHPB water licence renewal (amendment to N7L2-1616 to extend term)
- 2004-12-22 – Agency to Distribution List re Agency-hosted mine reclamation workshop
2003 Agency Outgoing Correspondence
- 2003-01-14 – Agency to MVLWB re BHPB Misery Prototype Land Treatment (Atomization) Draft License Review (MV2002L2-0003)
- 2003-03-03 – Agency Comments on the BHPB Environmental Impact 2003 Table of Contents – Jane Howe, BHPB, IACT and Society Members
- 2003-03-21 – Agency Letter re Recommendations from the Traditional Knowledge and Monitoring Workshop
- 2003-03-21 – Notice to Society Members of Recommendations – Society Members
- 2003-05-05 – Agency to BHPB, Society Members re recent consultation and communication activities
- 2003-05-12 – Agency to MVEIRB re Agency assessment of caribou behaviour at Ekati
- 2003-05-14 – Agency to BHPB re Air Quality Monitoring Report (2001) and Plan (2003)
- 2003-06-04 – Agency to Society Members re Review Opportunity for BHPB’s Environmental Impact Report for 2003
- 2003-06-23 – Agency to BHPB, Society Members re review of RWED proposal for GPS collars for wolves on Ekati claim block
- 2003-06-23 – Water Licence Plan Submission and Review BHPB N7L2-1616 2002 Seepage and Waste Rock Survey Report
- 2003-07-03 – Agency Recommendations for BHPB Air Quality Management and Monitoring Plan 2003 – Ian Goodwin (BHPB), Society Members, Envi
- 2003-07-11 – Agency to MVLWB, Society Members re Concerns Regarding Fox Mining Activities and Approvals
- 2003-07-14 – Agency to MVLWB, Society Members re Water Licence N7L2-1616 and MV2001L2-0008 Comments on WPKMP
- 2003-07-23 – Agency to MVLWB, Society Members re Comments on BHPB Proposal for Interim Permission for Fox Mining, N7L2-1616
- 2003-09-11 – Agency to BHPB re Comments on BHPB Nitrate Toxicity Study
- 2003-09-12 – Agency to Society Members re Notification of Agency AGM to Society Members, October 28th, 2003
- 2003-10-01 – Agency to MVLWB, Society Members, IACT re BHPB’s 2003 Interim Abandonment and Restoration Plan
- 2003-12-04 – Agency to Society Members, IACT re New Executive to replace Red Pedersen
2002 Agency Outgoing Correspondence
- 2002-11-08 – Letter for distribution re Potential Nitrate Toxicity Issues
- 2002-12-13 – Agency comments on BHPB Aquatic Effects Monitoring Program Re-evaluation and Refiinement – Jane Howe (BHPB)
- 2002-12-13 – BHPB statements re: natural runoff water quality at Ekati Diamond MineTM – Melody McLeod (MVLWB)