On the Correspondence pages of our website, we post electronic versions of most incoming and outgoing correspondence related to the Ekati mine, as well as Agency comments on the Ekati project. We are generally unable to post full versions of annual environmental monitoring plans and programs due to the large size of the files. However, hard copies of all documents are available in the Agency’s Resource Library, located in our office in Yellowknife. Or they are available for download on the Wek’eezhii Land and Water Board(WLWB) website. You will find that much of our correspondence uses acronyms or abbreviations (e.g. IEMA instead of Independent Environmental Monitoring Agency).  For a list of commonly used acronyms, download our Acronym List.  If you would like to become more familiar with some of the terms commonly used in our correspondence, download our Glossary of Terms.

Agency Correspondence

Click on the links below to download letters and attachments from the Agency.  Outgoing correspondence is organized by date.  Documents are in Adobe PDF, Microsoft Word or Microsoft Excel format.

Outgoing Correspondence

2017 Agency Outgoing Correspondence

2017-01-11 – Agency Letter to GNWT-ENR on 2016 EIR – Final Review Comments
2017-01-13 – Agency Letter to DDEC on Support for the ‘Towards Sustainable Mining Environment Excellence Awards’ – Waste Management Program
2017-01-13 – Agency Letter to WLWB on Sable and Two Rock Lake Withdrawal Limits Amendment Application
2017-01-19 – Agency Letter to WLWB on Waste Rock and Ore Management Plan v6.2 – Request for Extension
2017-01-26 – Agency Letter to WLWB on Waste Rock and Ore Managment Plan v6.2 – Proposed Raise of Misery Waste Rock Pile
2017-02-13 – Agency Letter to WLWB on Sable Drawdown Limits
2017-02-14 – Agency Letter to WLWB on Waste Rock Storage Area Closure Ecological Risk Assessment – Agency Review
Attachment: Review of Ekati Closure Ecological Risk Assessment

2016 Agency Outgoing Correspondence

2016-07-29 – Agency Letter to DDEC on 2016 Conceptual AQEMMP for the Jay Project
2016-08-03 – Agency Letter to WLWB on Jay Project Water Licence and Land Use Permit Application
2016-07-08 – Agency Letter to GNWT on 2015 EA and WL Annual Report and Summary Report
2016-06-30 – Agency Letter to WLWB on Jay Project Early Works LUP Application
2016-07-05 – Agency Letter to DDEC on Ekati WEMP and CRMP Review
2016-10-14 – Agency Reponse to Information Requests for Jay Project Water Licence Application
2016-10-18 – Agency Letter to WLWB on Sable AEMP Design Plan Version 1.1.
2016-10-14 – Agency Reponse to Information Requests for Jay Project Water Licence Application
2016-08-11 – Agency Letter to DDEC on 2016 EIR – Information for the EIR technical session
2016-09-15 Agency Letter to WLWB on DDEC’s 2015 AEMP Re-Evaluation Report
2016-12-09 – Agency Letter to WLWB on Jay Early Works Road Construction Plan
2016-06-17 – Agency Letter to WLWB on Agency Comments on Community Composition Response Plan
2016-06-17 – Agency Letter to WLWB on Agency Comments on the Chloride Response Plan
2016-06-24 – Agency Letter to MVLWB on Review of MVLWB’s Guidelines for Effluent Mixing Zones
2016-06-17 – Agency letter to WLWB on Agency Comments on the Phosphate Response Plan
2016-06-17 – Agency Letter to WLWB on Agency Comments on the Fish Response Plan
2016-06-17 – Agency Letter to WLWB on Agency Comments on Dissolved Oxygen Response Plan
2016-01-26 – Agency Letter to Society Members, Agency’s new Executive Director
2016-01-26 – Agency Letter to DDEC on Letter of Support for the Towards Sustainable Mining Environment Excellence Award, Waste Management Program
2016-02-16 – Agency Letter to DDEC on Request for Additional Funds
2016-01-28 – Agency Letter to WLWB on Agency Comments on Sable AEMP Design Plan
2016-06-01 – Agency Letter to WLWB on Review of AEMP Re-evaluation/Re-Design – All Stakeholders Discussion

2015 Agency Outgoing Correspondence

2015-01-06 – Agency Comments on DDEC’s 2014 Final Lac de Gras Regional Grizzly Bear DNA Report and 2013 WEMP Addendum
2015-01-16 – Agency Comment on the Lynx Project and the Ekati AEMP
2015-01-28 – Agency Submission to GNWT on Environmental Agreement Financial Security – Article IV
2015-01-28 – Attachment: Agency Financial Requirements 2015-2060
2015-01-29 – Letter of support for Towards Sustainable Mining Environment Excellent Awards – Grizzly Bear DNA Program
2015-01-30 – IEMA Comment on WWHPP and WEMP Guidelines
2015-01-30 – Attachment: IEMA Comment Table – WWHPP and WEMP
2015-01-30 – Additional Comment on the AEMP Design Plan Update for Lynx Project–Monitoring of Fugitive Dust Effects from Lynx Project
2015-02-13 – Agency Covering Letter for Jay Project Information Requests
2015-02-13 – Jay Project IEMA Information Requests
2015-03-02 – Agency Letter on 2014 ICRP Progress Report
2015-03-02 – Attachment: Agency Comment Table for 2014 ICRP Progress Report
2015-03-16 – Agency Letter on Final Steps in Ekati Environmental Agreement Security Deposit
2015-05-21 – Agency Letter on Fisheries Act Review of Proposed Lynx Project
2015-06-01 – Agency Comment Letter on 2014 AQMP Report
2015-06-01 – Agency Comments on the Ekati Potassium Response Plan (Version 1.0)
2015-06-04 – Agency Comments on Ekati Waste Rock Storage Area Risk Framework
2015-06-05 – Covering Letter on Jay Project Second Round Information Requests
2015-06-05 – Agency Jay Project Second Round Information Requests
2015-07-14 – Agency Letter to Aboriginal Society Members on Proposed Environmental Agreement Changes
2015-07-20 – Agency Letter on Lynx Project Land Lease Applications
2015-07-22 – Agency Comment Table for 2014 AEMP Report
2015-07-30 – IEMA Jay Project Technical Report
2015-09-23 – Agency Comments on Ekati Potassium SSWQO Submission
2015-09-24 – Agency Letter of Support for CIMP Zooplankton Study
2015-09-28 – Agency Response to Jay Project Public Hearing Undertaking #9
2015-10-09 – Agency Letter on Environmental Agreement Security Deposit (October 2015)
2015-10-19 – IEMA Jay Project Closing Submission
2015-10-19 – Notice and Invitation to the Annual General Meeting of the Independent Environmental Monitoring Agency
2015-12-14 – Agency Letter to DDEC on Request for Additional Funds

2014 Agency Outgoing Correspondence

2014-01-14 – Agency to WLWB, Intervention on Ekati Lynx Project Water Licence WL 2013L2-0001 and LUP W2013D0006
2014-01-21 – Agency Letter to Minister of ENR Michael Miltenberger, Financial Security Gap for Closure
2014-02-05 – Agency to WLWB, Comments on the Pigeon Waste Rock Pile Design
2014-02-07 – Agency to WLWB, Chris Burn Comments on the Pigeon Waste Rock Pile Design
2014-02-10 – Agency to MVEIRB, Comments on Jay Cardinal Project Draft Terms of Reference
2014-03-03 – Agency to WLWB, Comments on Draft Lynx Land Use Permit and Draft Water Licence.
2014-03-05 – Agency Letter to WLWB and DDEC, 2013 Annual ICRP Progress Report
2014-03-05 – Agency to WLWB and DDEC, Comments on the 2013 ICRP Progress Report
2014-03-05 – Agency Letter to WLWB and DDEC, Improvements to Ekati Fish Sampling
2014-03-17 – Agency Letter to Society Members, Notice of Special Meeting
2014-03-17 – Agency Letter to AANDC, ENR and DDEC, Proposed Changes to the Ekati Environmental Agreement
2014-03-25 – Agency Letter to AANDC, ENR and DDEC, Follow-up to Special Meeting of the Society Members on Changes to the Environmental Agreemment
2014-04-03 – Agency Letter to YKDFN, Thank You for Agency Community Visit
2014-04-08 – Agency to WLWB, Comments DDEC’s Community Engagement Plan
2014-04-17 – Agency Letter to WLWB, Comments on Ekati Nitrogen Response Plan
2014-04-17 – Attachment: Comment Table on Ekati Nitrogen Response Plan
2014-05-20 – Agency Letter to WLWB, Comments on the Aquatic Response Framework
2014-05-20 – Attachment: Agency Comment Table on Aquatic Response Framework
2014-06-18 – Agency to WLWB, Comments on Misery Powerlines
2014-05-28 – Agency to WLWB, Comments on Ekati Waste Management Plan
2014-06-25 – Agency Letter to DDEC, Thank You for Recent Site Visit.
2014-07-02 – Agency Letter to MVEIRB, Agency Comments on Amendments to the Jay Project (EA 1314-01)
2014-07-02 – Attachment: Agency Comments on Amendments to the Jay Project (EA 1314-01)
2014-07-18 – Agency Letter to DDEC, Plans For and Design of Dust Supression Study at Ekati Mine
2014-07-21 – Agency Letter to ENR, Agency Comments on DDEC’s 2013 Annual Report
2014-08-01 – Agency Letter to WLWB, Comments on Misery Power Line Additional Information (W2014001)
2014-08-01 – Attachment: Agency Comments on additional Information on Misery Power Line
2014-08-06 – Agency Letter to DDEC and GNWT, Financial Security Under the Ekati Environmental Agreement
2014-09-29 – Agency Letter to WLWB, Agency Comments on Ekati Mine Water Licence Amendment – Part C Security
2014-10-14 – Agency Letter to Society Members, Notice of Annual General Meeting of the Independent Environmental Monitoring Agency, December 4 2014
2014-10-14 – Agency Comments on 2013 ICRP Progress Report Supplemental Information
2014-10-27 – Agency Comments on 2015 Work Plan for Exploration at Ekati
2014-10-01 – Agency Letter to GNWT, DDEC, Agency Proposal for Ekati Environmental Agreement Financial Security
2014 -10-16 – Agency Letter to GNWT, DDEC, Agency Proposal for Ekati Environmental Agreement Financial Security (revised October 16, 2014)
2014-12-19 – Agency Letter to WLWB on Aquatic Response Framework Version 1.1
2014-12-19 – Attachment: Comment Table – Aquatic Response Framework Version 1.1

2013 Agency Outgoing Correspondence

2013-02-05 – Agency Letter to WLWB re: Ekati’s ICRP progress report
2013-02-27 – Agency to WLWB, Closing Comments – Water Licence Renewal
2013-04-09 – Agency to WLWB, Comment Table for draft Water Licence Renewal
2013-04-30 – Agency Letter to WLWB, Reclamation Security Estimate
2013-04-30 – Attachment: Reclamation Security Estimate
2013-06-14 – Agency to WLWB, Comments on DDEC’s 2012 AEMP
2013-06-28 – Agency to WLWB, Comments on the 2012 Seepage Report
2013-07-09 – Agency Letter to ENR Minister Michael Miltenberger, Nominations to the WLWB
2013-07-16 – Agency Letter to ENR, Zone of Influence Requirement for Caribou Monitoring
2013-08-12 – Agency Letter to AANDC, Ekati Financial Security
2013-08-14 – Agency Letter to AANDC, 2012 DDEC Annual Report
2013-10-08 – Agency to WLWB, Comments on LUP Application W2013C0005 Ekati Exploration
2013-10-24 – Agency to WLWB, Lynx Application Comments, Covering Letter
2014-10-24 – Agency to WLWB, Lynx Application Comment Table
2013-11-20 – Agency to WLWB, Comments on Proposed Developments of the Jay-Cardinal Project W2013D0007 and W2013L2-0002
2013-11-25 – Joint Agency Letter to GNWT and AANDC on Devolution and the Environmental Agreements

2012 Agency Outgoing Correspondence

2012-01-18 – Agency to BHPB, ENR, AANDC re: 2011 Workshop on Traditional Knowledge
2012-01-18 – Attachment – TK Workshop Summary of Discussion
2012-01-31 – Agency to GNWT re: Grizzly Bear Monitoring
2012-02-27 – Agency to WLWB re: 2012 Fish Sampling Proposal
2012-02-27 – Attachment – Fish Sampling Program Comment Table (Microsoft Excel)
2012-03-30 – Agency to WLWB re: Agency Comments on WROMP
2012-03-30 – Attachment – Agency Comments on WROMP (Microsoft Excel)
2012-04-27 – Agency to LWB of MV re Draft Community Engagement Policy and Guidelines
2012-05-17 – Agency to BHPB re Grizzly Bear Hair Snagging Program
2012-06-13 – Agency to WLWB and BHPB re: 2011 AEMP
2012-06-13 – Attachment – Agency Comments on 2011 AEMP
2012-06-22 – Agency to BHPB re: BBCI Wildlife Research Permit Application
2012-07-03 – Agency to AANDC re AANDC Inspection Capacity
2012-07-25 – Agency to WLWB re Water Licence Renewal Preliminary Screening Exemption
2012-08-30 – Agency to WLWB re: WPKMP v. 3
2012-08-30 – Attachment – Agency Comments re WPKMP v.3
2012-09-11 – Agency to Chief Alfonz Nitsiza re Whati Visit
2012-09-24 – Agency Comments on Ekati Water Licence Renewal Application
2012-09-24 – Agency to BHPB re: Early Adption of the Proposed Nitrate SSWQO at Ekati
2012-09-24 – Attachment – Agency Water Licence Renewal Comment Table
2012-09-26 – Agency to Chief Alfonz Nitsiza re: Visit to Whati
2012-09-26 – Agency to SAO of Whati re: Visit to Whati
2012-11-02 – Agency to Society Members re: 2012 AGM invitation
2012-11-29 – Agency to AANDC re: 2011 BHPB Annual Report and 2012 EIR
2012-12-11 – Agency to BHPB, ENR, AANDC re: Whati Community Concerns
2012-12-21 – Agency to WLWB re: Intervention – Renewal of Water Licence 2011 Agency Outgoing Correspondence
2011-01-07 – Agency email to WLWB re: BHPB Modification Request – Misery Waste Rock Pile
2011-01-10 – Agency to BHPB, ENR, DIAND re: Highlights from 2010 Environmental Workshop
2011-01-12 – Agency to WLWB re: Conformity Check of the WPKMP
2011-01-25 – Agency to BHPB re: 2008-09 Fay Bay Spill Monitoring Report
2011-01-25 – Agency to DIAND, ENR, WLWB, BHPB re: Community Capacity for Mine Closure Planning
2011-02-15 – Agency to Society Members re: ICRP Decision
2011-02-22 – Agency to Kitikmeot Inuit Association
2011-02-22 – Agency to Kugluktuk Mayor
2011-04-12 – Agency Thank You to KIA President
2011-04-12 – Agency Thank You to Kugluktuk Mayor
2011-04-14 – Agency to BHPB re: Wildlife Monitoring
2011-05-02 – Agency to ENR Minister re: Wildlife Act
2011-07-11 – Agency to BHPB re: Use of Nitrate IPS in Ekati Water Mngt
2011-07-19 – Agency to WLWB re: Adaptive Management Plan for Ekati
2011-09-08 – Agency to DIAND re: BHPB 2010 Annual Report
2011-10-03 – Agency cover email to WLWB re: Comments on Draft Closure and Reclamation Guidelines
2011-10-03 – Attachment – Draft Closure and Reclamation Guidelines – Agency Comments (undated)
2011-11-16 – Agency to WLWB re: Agency Comments on 2011 WPKMP
2011-11-16 – Attachment – 2011 WPKMP Table

2010 Agency Outgoing Correspondence

2010-02-17 – Agency, EMAB, SLEMA Joint Letter to WLWB re: Caribou Monitoring
2010-03-26 – Agency covering email re: Agency Comments on Updated WPKMP
2010-03-26 – Attachment – WPKMP Update Comments from IEMA (undated)
2010-04-28 – Agency to DIAND re: BHPB EIR 2009 Close-out Report and Technical Addendum
2010-05-17 – Agency to BHPB re: Nitrate IPS in Ekati Water Management
2010-05-31 – Agency to BHPB re: Comments on 2009 WEMP Report
2010-07-15 – Agency to WLWB re: Comments on Draft MVLWB Water Policy
2010-07-26 – Agency to WLWB re: Intervention on ICRP
2010-10-04 – Agency to DIAND re: Comments on 2009 Ekati Annual Report
2010-10-20 – Agency to BHPB Re Transfer of Contributed Services
2010-10-20 – Agency to BHPB re: Agency Working Capital Deficit
2010-11-03 – Agency cover e-mail re: Peer Review of PDC 10-Year Summary Report
2010-11-03 – Attachment – BHPB to Agency re: Agency Review of PDC (Nov. 2, 2010)
2010-11-03 – Attachment – Peer Review of 10-Year PDC Monitoring Program Report (June 25, 2010)
2010-11-25 – Agency to BHPB HSEC re: BHPB Participation in AQMP Workshop
2010-12-16 – Agency to BHPB HSEC re: Ekati Widlife Monitoring and Managment
2010-12-20 – Agency to WLWB re: Response Framework for Aquatic Effects Monitoring

2009 Agency Outgoing Correspondence

2009-01-20 – Agency Letter to WLWB re: Updated ICRP
2009-01-27 – Agency Letter to WLWB re use of Beartooth Pit as Minewater Sump
2009-02-12 – Agency Letter to WLWB re: ICRP Verification Comments
2009-02-13 – Agency Intervention re Sable Pigeon Beartooth Public Hearing
2009-02-17 – Agency Letter re: 2008 Environmental Workshop
2009-03-17 – Agency Letter to BHPB on Changes to 2009 WEMP
2009-03-20 – Agency Letter to BHPB and Diavik on 2009 Caribou Monitoring
2009-05-14 – Agency Letter to Society Members re: External Review
2009-05-18 – Agency Letter to WLWB re: Draft Amalgamated Licence
2009-05-21 – Agency Letter to WLWB Requesting Extension to Reply to BHPB Motion
2009-05-5 – Agency ICRP Intervention for Public Hearing
2009-06-24 – Submission of the Agency in Response to BHPB Motion
2009-07-22 – Agency to WLWB on Draft Closure & Reclamation Preparation Guidelines
2009-07-24 – Agency to WLWB re Agency Review of 2008 AEMP
2009-09-22 – Agency to Distribution for Annual Report
2009-10-14 – Agency Letter to INAC on BHP EIR
2009-10-15 – Agency Notice to Society Members re Annual General Meeting
2009-10-16 – Agency Letter to Chief Chocolate
2009-10-19 – Agency to Akaitcho Treaty 8 BHPB IBA Office re: Environmental Info Sessions
2009-10-20 – Agency Letter to WLWB on ICRP Revisions
2009-12-02 – Joint Letter to BHP, Diavik, DeBeers, ENR re: Wildlife Monitoring Workshop
2009-12-11 – Agency to BHP, Diavik, DeBeers, ENR re: Wildlife Monitoring Program Review
2009-12-16 – Agency to WLWB re: Comments on Draft Guidelines for Waste Management

2008 Agency Outgoing Correspondence

2008-01-07 – Agency letter to Society Members re: Environmental Workshop comments
2008-01-28 – Agency letter to WLWB re ICRP section 3
2008-02-08 – Agency letter to EA signatories re 5-year review
2008-02-25 – Agency letter to BHPB re Sable, Pigeon and Beartooth licence renewal
2008-03-26 – Agency letter to WLWB re date for ICRP section 4 working group meeting
2008-03-30 – Agency letter to WLWB re watershed adaptive management plan
2008-04-04 – Agency ICRP Section 4 Comment Table (Microsoft Word)
2008-04-04 – Agency Letter to WLWB re Section 4 ICRP
2008-04-23 – Agency letter to WLWB re water licence amalgamation
2008-06-04 – Agency Section 4 Interim Closure and Reclamation Plan verification comments
2008-06-09 – Agency review of the Watershed Adaptive Management Plan cover letter
2008-06-18 – Agency comments on 2007 AEMP
2008-06-18 – Agency comments on LLCF water quality model
2008-06-18 – Agency comments on water licence amalgamation
2008-06-18 – Agency letter to BHPB re 2007 WEMP
2008-08-06 – Agency letter to WLWB on Sable, Pigeon and Beartooth water licence renewal
2008-08-07 – Agency comments on reclamation research plan
2008-09-25 – Agency letter to DIAND re 2007 annual environmental report
2008-10-01 – Agency response to ICRP survey from the WLWB
2008-10-09 – Agency letter to BHPB re Air Quality Monitoring Plan revisions
2008-10-09 – Agency Lutsel K’e visit follow up letter
2008-10-15 – Agency Letter to BHPB re LLCF Water Quality Model
2008-12-16 – Agency Letter to DIAND re AEMP Guidelines
2008-12-16 – Agency Letter to DIAND re McCrank Report
2008-12-19 – Agency Letter to DIAND re: Water Quality Standards

2007 Agency Outgoing Correspondence

2007-01-25 – Agency letter to society members re annual report responses to recommendations
2007-01-31 – Agency letter to WLWB re geochemical characterization & metal leaching mngt plan
2007-02-08 – Agency letter to WLWB on AEMP 2007-09
2007-03 – SENES review of 2005 AQMP CALPUFF Air Dispersion Modelling Assessment for Ekati
2007-03-14 – Agency letter to WLWB re ICRP comments on section 1
2007-04-03 – Monitoring agencies review of caribou monitoring programs
2007-04-27 – Agency letter to WLWB re Option C approach for structure of ICRP objectives
2007-05-09 – Agency letter to WLWB re ICRP verifiication comments
2007-07-27 – Agency letter to WLWB re ICRP section 2
2007-08-02 – Agency letter to BHPB re air quality monitoring
2007-08-03 – Agency letter to WLWB re AEMP sampling reduction
2007-08-30 – Agency to WLWB re ICRP summary table
2007-10-04 – Agency letter to WLWB re ICRP section 2 verification comments
2007-10-05 – Agency comments to BHPB regarding its Environmental Annual Report
2007-10-05 – Agency comments to DIAND re BHPB annual environmental report
2007-10-19 – Agency comments to BHPB re WPKMP
2007-11-16 – Agency letter to WLWB re waste rock pile expansion
2007-11-19 – Agency letter to BHPB re ICRP section 3
2007-11-27 – Agency letter to BHPB re AEMP and WEMP

2006 Agency Outgoing Correspondence

2006-02-15 – Agency to MVLWB on draft ToR for ICRP
2006-02-15 – Agency to WLWB re comments on Pit Lake study Task 1 and 2
2006-02-17 – Agency to BHPB re Wolverine Skirting
2006-02-17 – Agency to EA Signatories re Director replacement
2006-03-13 – Agency to DIAND re participant funding
2006-03-24 – Agency to BHPB re Annuan Environmental Report
2006-03-31 – Agency to BHPB re Closure and Reclamation
2006-03-31 – Agency toWLWB re small diamond recovery
2006-04-07 – Agency to WLWB re waste rock seepage report
2006-04-18 – Agency to WLWB on revised ToR for ICRP
2006-04-28 – Agency to DIAND re Ekati Inspections
2006-05-05 – Agency to WLWB re WPKMP
2006-05-08 – Agency to BHPB re air quality monitoring at Ekati
2006-06-16 – Agency to WLWB re chloride addition to For ore
2006-06-23 – Agency to DIAND re Environmental Impact Report
2006-06-26 – Agency to WLWB re additional chloride information
2006-08-04 – Agency to BHPB re comments on closure options workshop
2006-08-09 – Agency to DIAND re Agency comments on BHPB 2005 environmental report
2006-09-01 – Agency to NSMA on comment distribution prior to regulatory timelines
2006-09-26 – Agency AGM invitation
2006-10-18 – Agency on BHPB reply to 2005 seepage report comments
2006-10-24 – Agency to BHPB re adaptive management plan
2006-10-25 – Agency to BHPB re deposition of minewater into cell d of LLCF
2006-10-31 – Agency to BHPB with response to BHPB closure objectives
2006-11-20 – Agency to WRRB re Bathurst Herd
2006-12-15 – Agency to BHPB re AEMP re-evaluation
2006-12-15 – Agency to WLWB re Road Watering

2005 Agency Outgoing Correspondence

2005-01-14 – Agency to MVLWB, Society Members re Amendment to the term of water licence N7L2-1616
2005-02-07 – Agency to BHPB re supplemental funding request
2005-02-10 – Agency to BHPB re Agency workplan and core budget 2005-2007
2005-02-14 – Agency to MVEIRB w/ comments on MVEIRB Traditional Knowledge guidelines
2005-02-18 – Agency Invitation to Agency hosted Ekati workshops
2005-02-25 – Agency to BHPB re response to IEMA funding request
2005-03-01 – Agency comments on BHPB pit lake study terms of reference – Sarah Baines (MVLWB)
2005-03-31 – Agency to DIAND, GNWT re Workshop on cumulative effects on wildlife in Slave Geological Province
2005-04-08 – Agency to IACT, Society Members re Recommendations from Agency workshop, March 2005
2005-05-04 – Agency to EA Signatories re: Agency comments on budget dispute resolution
2005-06-17 – Agency comments on draft 3 of BHPB water licence MV2003L2-0013 – MVLWB, Society Members
2005-07-13 – Agency to GNWT re Continuing committment to caribou research and monitoring
2005-08-05 – Agency to DIAND re Mine Site reclamation guidelines for NWT
2005-09-12 – Agency to BHPB re: waste rock seepage – David Scott (BHPB)
2005-09-12 – Agency to BHPB re: waste rock seepage consultant report – David Scott (BHPB)
2005-09-26 – Agency to Society Members re Notice of Annual general meeting
2005-09-29 – Agency to EA Signatories re: Dispute resolution process for Agency core budget and workplan
2005-10-05 – Agency to BHPB re: 2006 environmental impact report – David Scott (BHPB)
2005-11-08 – Agency to Distribution List with Agency AGM 2005 meeting summary
2005-11-09 – Agency to BHPB regarding closure planning process – David Scott (BHPB), Society Members
2005-11-09 – Agency to BHPB regarding closure planning process Attachment – David Scott (BHPB), Society Members

2004 Agency Outgoing Correspondence

2004-02-02 – Agency to BHPB, Society Members re – Budget of the Independent Environmental Monitoring Agency
2004-02-02 – Agency to BHPB, Society Members, IACT re Cancellation of Ekati Environmental Workshops
2004-02-02 – Agency to MVLWB re BHP Request for Exemption from Preliminary Screening for Renewal Application of Water Licence N7L2-1616
2004-02-18 – Agency to Distribution List re Invitation to BHPB environmental workshops hosted by the MVLWB and IEMA
2004-02-18 – Agency to EMAB w/ request for enhanced inter-agency communication and invitation for a joint EMAB-IEMA Board Meeting
2004-03-24 – Agency to MVLWB w/ Comments on the Type A Ekati water licence (MV2003L2-0013) renewal
2004-04-13 – Agency to DIAND, BHPB re Recommendations from the Environmental Workshop hosted by IEMA March 16th & 17th, 2004
2004-04-19 – Agency to BHPB re Rescan February 2004 Proposal to Update Ekati Air Dispersion Model
2004-04-19 – Agency to BHPB re SENES Consultants Ltd. Peer Review of Proposed Update to Ekati Mine’s Air Dispersion Modeling Assessment
2004-05-05 – Agency to MVLWB re BHPB April 2004 Abandonment and Reclamation Plan
2004-05-14 – Agency to MVLWB, DIAND re BHPB’s 2003 Abandonment and Reclamation Plan, Ekati Mine
2004-05-18 – Agency to MVLWB re BHPB application for Renewal of Water Licence MV2003L2-0013 (formerly N7L2-1616) – Agency intervention letter
2004-06-23 – Agency to MVLWB, Society Members re Agency comments on BHPB’s 2003 Waste Rock Report consultant report
2004-06-23 – Agency to MVLWB, Society Members re Agency Comments on BHPB’s 2003 Waste Rock Report letter
2004-07-23 – Agency to MVLWB, Society Members re Ekati Abandonment and Reclamation Plan (A&R Plan) and Security- MV2003L2-0013
2004-09-09 – Agency to DIAND, GNWT re Outstanding budget issue
2004-09-10 – Steering Committee c/o Agency to BHPB, MVLWB re Focussed Independent Review of Select Parameters of Ekati’s AEMP
2004-09-29 – Agency to BHPB, DIAND, GNWT, Society Members re Proposal to participate in monitoring activities of the LLCF
2004-09-30 – Agency to DIAND re Comments on Mine Reclamation Guidelines – David Livingstone (DIAND), Society Members, EMAB
2004-09-30 – Agency to DIAND, Society Members, EMAB re Agency suggestions for changes to the draft text
2004-09-30 – Agency to Environment Canada re Agency request for Environment Canada to review BHPB nitrate toxicity study
2004-10-04 – Agency to Society Members re Invitation to 2003-04 Annual General Meeting
2004-10-28 – Agency to BHPB re Agency budget
2004-11-18 – Agency to DIAND, GNWT re Resolution of outstanding budget related issues of IEMA
2004-12-03 – Agency to DIAND re appointment of Dr. Ward Wilson to IEMA Board of Directors – Bob Overvold (DIAND)
2004-12-03 – Agency to MVLWB re draft 2 of water licence MV2003L2-0013 – Stephen Nielson (MVLWB)
2004-12-14 – Agency to MVLWB re BHPB water licence renewal (amendment to N7L2-1616 to extend term)
2004-12-22 – Agency to Distribution List re Agency-hosted mine reclamation workshop

2003 Agency Outgoing Correspondence

2003-01-14 – Agency to MVLWB re BHPB Misery Prototype Land Treatment (Atomization) Draft License Review (MV2002L2-0003)
2003-03-03 – Agency Comments on the BHPB Environmental Impact 2003 Table of Contents – Jane Howe, BHPB, IACT and Society Members
2003-03-21 – Agency Letter re Recommendations from the Traditional Knowledge and Monitoring Workshop
2003-03-21 – Notice to Society Members of Recommendations – Society Members
2003-05-05 – Agency to BHPB, Society Members re recent consultation and communication activities
2003-05-12 – Agency to MVEIRB re Agency assessment of caribou behaviour at Ekati
2003-05-14 – Agency to BHPB re Air Quality Monitoring Report (2001) and Plan (2003)
2003-06-04 – Agency to Society Members re Review Opportunity for BHPB’s Environmental Impact Report for 2003
2003-06-23 – Agency to BHPB, Society Members re review of RWED proposal for GPS collars for wolves on Ekati claim block
2003-06-23 – Water Licence Plan Submission and Review BHPB N7L2-1616 2002 Seepage and Waste Rock Survey Report
2003-07-03 – Agency Recommendations for BHPB Air Quality Management and Monitoring Plan 2003 – Ian Goodwin (BHPB), Society Members, Envi
2003-07-11 – Agency to MVLWB, Society Members re Concerns Regarding Fox Mining Activities and Approvals
2003-07-14 – Agency to MVLWB, Society Members re Water Licence N7L2-1616 and MV2001L2-0008 Comments on WPKMP
2003-07-23 – Agency to MVLWB, Society Members re Comments on BHPB Proposal for Interim Permission for Fox Mining, N7L2-1616
2003-09-11 – Agency to BHPB re Comments on BHPB Nitrate Toxicity Study
2003-09-12 – Agency to Society Members re Notification of Agency AGM to Society Members, October 28th, 2003
2003-10-01 – Agency to MVLWB, Society Members, IACT re BHPB’s 2003 Interim Abandonment and Restoration Plan
2003-12-04 – Agency to Society Members, IACT re New Executive to replace Red Pedersen 2002 Agency Outgoing Correspondence
2002-11-08 – Letter for distribution re Potential Nitrate Toxicity Issues
2002-12-13 – Agency comments on BHPB Aquatic Effects Monitoring Program Re-evaluation and Refiinement – Jane Howe (BHPB)
2002-12-13 – BHPB statements re: natural runoff water quality at Ekati Diamond MineTM – Melody McLeod (MVLWB)

Incoming Correspondence

2014 Incoming Correspondence
2014 – Proposed Changes to the Ekati Environmental Agreement 2013 Incoming Correspondence
2013-01-04 – AANDC to BHPB re: Water Licence Inspection Report December 2012 2012 Incoming Correspondence
2012-01-11 – BHPB to AANDC re Response to 2010 EA-WL AR Stakeholder Comments
2012-01-19 – BHPB to AANDC re Cell E (1616-30) 2011 Pumping Summary
2012-03-29 – ENR to Agency re Regional grizzly monitoring program IEMA info request
2012-03-29 – GWNT to Agency re Regional grizzly monitoring program IEMA info request
2012-03-30 – AANDC to BHPB re Direction for BHP to Conduct Daily LLCF Inspections
2012-04-11 – BHPB to AANDC re Request for Approval to Build PSD North Road
2012-04-13 – AANDC to BHPB re Request to Construct Access Road within 10m of PSD
2012-04-24 – WLWB to BHPB re AEMP Proposed Fish Sampling Program – Board Decision
2012-05-10 – ENR to DDMI re ZOI requirement for Grizzly Bear Monitoring Program
2012-05-16 – SLEMA to DeBeers re Joint Regional Grizzly Bear DNA Proposal 2012
2012-05-24 – ENR to BHPB, DDMI, DBCI re Draft Joint Regional Grizzly Bear DNA Proposal 2012
2012-05-24 – RESCAN, Golder to Distribution re Mines response to Grizzly DNA proposal review
2012-05-30 – BHPB to AANDC re Notification of Use of Envirokleen Dust Suppressant
2012-05-30 – DBCI to ENR and SLEMA re Joint Grizzly Hair Snagging Monitoring
2012-06-04 – BHPB to Distribution re Ekati Wildlife Research Permit 2012 Cover Letter
2012-06-11 – BHPB to Agency re Endocrine Disrupting Compounds
2012-06-15 – BHPB memo to AANDC re PSD Biweekly Update
2012-10-18 – Environmental Impact Report 2012 Public Sessions Invite Aboriginal and Community Issues (BHPB) Agency Annual Reports
March 29th, 2007 BHPB response to Agency recommendations from 2005-06
June 26th, 2006 BHPB response to Agency 2004-2005 Annual Report Recommendations Air Quality Monitoring Program
March 31st 2009, BHPB Cover Letter re: 2009 AQMP
November 21, 2008 – BHPB Letter to Agency re Air Quality Monitoring
EPA snow quality research Arctic 26-4-335
1997 snow monitoring research Barbante et al.
SENES review of AQMP – final
April 24rd, 2007 ENR letter to BHPB re air quality report
February 13th, 2007 NSMA letter to WLWB re air quality monitoring program
February 19th, 2007 BHPB reply to NSMA re air quality monitoring program
February 13th, 2007 EC-GNWT review of CALPUFF monitoring program
September 13th, 2006 EC and GNWT letter to BHBP re site visit to locate air quality monitoring stations Aquatic Effects Monitoring Program (AEMP)
2009-02-18 – BHPB to DFO re: 2007 Nero-Nema & Panda Diversion Channel Monitoring Program Reports
October 1st, 2008 Purpose, Objectives, Outcomes of AEMP workshop
September 18th, 2008 WLWB decision BHPB 2007 AEMP
October 1st, 2008 DIAND AEMP guidelines workshop agenda
September 1st, 2008 Macdonald/Zajdlik AEMP guidelines overview v4
June 30th, 2008 ecometrix review of koala watershed
September 17th, 2008 WLWB decision package, 2007 AEMP
June 2008 Ecometrix review of AEMP 2007
June 2008 Jacques Whitford Review of BHPB Watershed Adaptive Management Plan
June 26th, 2008 AEMP comment table (questions only)
June 20th, 2008 NSMA comments on 2007 AEMP
June 20th, 2008 DIAND comments on 2007 AEMP
June 20th, 2008 DFO comments on 2007 AEMP
June 2nd, 2008 AEMP 2007 comment table (questions only)
May 12th, 2008 ESSA review of Diavik and Ekati adaptive management plans
April 28th, 2008 consultant review report on Ekati and Diavik Adaptive Management Plans
April 30th, 2008 BHPB letter to WLWB re 2007 AEMP
December 4th, 2007 WLWB receipt of watershed adaptive management program
October 29th, 2007 NSMA comments on AEMP
August 10th, 2007 EC comments on AEMP sampling reduction
August 3rd, 2007 NSMA comments on AEMP sampling reduction
August 3rd, 2007 ENR comments on AEMP sampling reduction
August 3rd, 2007 DIAND comments on AEMP sampling reduction
August 2nd, 2007 DFO comments on AEMP sampling reduction
April 2007 AEMP 2007-09 joint comments table
April 19th, 2007 WLWB approval of AEMP 2007-09
March 1st, 2007 WLWB letter to BHPB re AEMP 2007-09
February 28th, 2007 GLL initial review of AEMP 2007-09
February 12th, 2007 DIAND review of 2007-09 AEMP Plan
December 31st, 2006 BHPB letter to WLWB AEMP review and proposed 2007-09 program
January 11th, 2007 AEMP 2007-09 review period
February 10th, 2007 NSMA comments on AEMP 2007-09 plan
December 14th, 2006 Zajdlik overview of proposed AEMP
December 31st, 2006 BHPB letter to WLWB re AEMP review and 2007-09 program
November 30th 2006 WLWB letter to BHPB re AEMP re-evaluation
October 19, 2006 BHPB letter to Agency re invitation to AEMP review BHPB Annual Reports – Water Licence / Environmental Agreement
2012-01-11 – BHPB to AANDC re: BHPB’s 2010 Water Licence/Environmental Agreement Annual Report
October 24th, 2008 DIAND Letter to BHPB re 2007 Annual Environmental Report
August 21st, 2008 Review timeline of BHPB annual environmental report
May 2008 Air quality and emissions management template
May 7th, 2008 DIAND letter on resolution of Minister’s report for 2006 EA and WL annual report
April 1st, 2008 BHPB invitation to Environmental Annual Report meeting
November 2nd, 2007 Minister’s Report on BHPB 2006 annual environmental report
June 7th, 2007 BHPB Annual Environmental Report released
February 8th, 2007 DIAND letter to BHPB re Minister’s report
December 22nd, 2006 GNWT letter to BHPB re annual report
December 7th, 2006 BHPB letter to DIAND and GNWT re EA and WL annual report for 2005
September 29th, 2006 DIAND Minister’s Report on BHPB 2005 Annual Report Environmental Impact Reports
June 4th, 2009 Revised BHPB Invitation to On Site EIR Information Session
May 27, 2009 BHPB Invitation to On Site EIR Information Session
May 6th 2009, WLWB Cover letter 2009 Environmental Impact Report
October 13th, 2006 BHPB response to DIAND Minister’s Report for EIR 2006
August 14th, 2006 DIAND Minister’s report on EIR 2006
July 2006 GNWT letter re EIR 2006 review
July 14th, 2006 DIAND letter to BHPB re EIR 2006 review
July 4th, 2006 DIAND letter to BHPB re EIR 2006
June 27th, 2006 BHPB cover letter re EIR 2006
June 29th, 2006 GNWT letter to DIAND re EIR 2006 Exploration
December 17th, 2007 Land use permit for misery/lac du sauvage exploration
December 17th, 2007 BHPB letter to DFO re winter water extraction for exploration Geochemical Characterization and Metal Leaching Management Plan
August 31st, 2007 geochemical characterization and metal leaching mgmt plan update
July 19th, 2007 BHPB letter to WLWB re ARD kimberlite study
April 3rd, 2007 WLWB approval of Geochemical characterization and metal leaching management plan
January 31st, 2007 re geochemical characterization and metal leaching management plan
January 31st, 2007 re geochemical characterization and metal leaching plan submission Hydrocarbon Contaminated Material Management Plan
November 16th, 2006 Ekati Hydrocarbon impacted material management plan Miscellaneous
February 12th, 2007 WRRB Bathurst Caribou hearing notice
June 2003 Bill Ross book chapter EIA follow up
February 1st, 2007 JRP letter to Agency
January 29th, 2007 ENR restructuring letter Operating Environmental Management Plan
February 8th, 2008 BHBP letter to EA signatories re 5-year review
October 24th, 2007 BHPB use of dust suppressant on Misery road
October 19th, 2007 SNP change (signed)
September 25th, 2007 DIAND letter to BHPB re mediation
September 14th, 2007 SNP monitoring station location
September 14th, 2007 BHPB letter to WLWB re SNP change
June 15th, 2007 WLWB road watering plan approval
May 8th, 2007 New BHPB CEO announced
April 12th, 2007 DFO response to BHPB request to dewater Siksik pond
March 31st, 2007 BHPB funding of agency
January 23rd, 2007 invitiation from JRP to participate in MGP hearing
January 19th, 2007 Topic 14 Joint Review Panel MGP hearing (env. monitoring)
December 1, 2006 DIAND letter to meet BHPB re current environmental issues
December 8th, 2006 DIAND Director appointment to IEMA letter
September 13th, 2006 EC GNWT letter to BHPB re Ekati site visit
October 17th, 2006 WLWB regulation of road watering October 06
September 29th, 2006 BHPB letter to Agency re 2nd payment
August 23rd, 2006 Director Replacement Mediation letter
June 26th, 2006 WLWB letter re SNP changes Reclamation and Closure
2011-12-21 – BHPB to WLWB re Posting of Security for Pigeon Project
July 2nd, 2009 BHPB Response to Submissions Made on Motion re: Board Jurisdiction
May 25th 2009, WLWB Letter re: Postponement of Hearing on BGPB Motion
May 15th, 2009 WLWB Letter re: BHPB Motion Regarding Board Jurisdiction over Fish and Fish Habitat
May 11th, 2009 BHPB Motion re: Board Jusrisdiction over Fish Habitat
April 14th 2009, DFO Letter to WLWB re: Information Request ICRP
April 14th 2009, BHPB Letter to WLWB re: Information Request in Preparation for ICRP Public Hearing
April 8th 2009, WLWB Information Request to BHPB re: Open Pit Reclamation
April 6th 2009, WLWB Information Request to DFO re: Open Pit Reclamation
March 6th, 2009 WLWB Directive – BHPB ICRP Advisory Document
February 18th, 2009 WLWB ICRP Verification Comment Table
February 17th 2009 BHPB Letter to WLWB re: Changes to Pit Lake Studies
February 13th, 2009 – Advisory Document ICRP Working Group
February 11th, 2009 DFO Comments to WLWB re ICRP
February 11th, 2009 INAC Comments to WLWB re ICRP
January 22nd, 2009 BHPB Response to ICRP Comments
September 1st, 2008 interview questions for BHPB ICRP participants
July 23rd, 2008 DIAND summary of ICRP related issues
July 7th, 2008 Questions for BHPB ICRP working group members on process
July 7th, 2008 WLWB ICRP section 4 advisory document
June 30th, 2008 WLWB staff report on ICRP section 4
June 27th, 2008 BHPB letter to WLWB re reclamation research plan
June 18th, 2008 WLWB section 4 verification comment table
June 13th, 2008 LKDFN section 4 verification comments
June 10th, 2008 JW section 4 verification comments
June 6th, 2008 ENR section 4 verification comments
June 6th, 2008 EC section 4 verification comments
May 16th, 2008 BHPB comment table ICRP section 4
June 5th, 2008 INAC section 4 verification comment table
June 5th, 2008 INAC section 4 verification cover letter
June 6th, 2008 DFO section 4 verification comments
April 11th, 2008 DFO and BHPB AIP on fisheries habitat in pit lakes
April 4th, 2008 DIAND comments on ICRP section 4
April 4th, 2008 EC ICRP section 4 comments
April 4th, 2008 DFO ICRP section 4 comment table
March 20th, 2008 Ekati pit lake study presentation part 1
April 4th, 2008 EC ICRP section 4 comment table
February 4th, 2008 JW section 3 verification comments
February 4th, 2008 BHPB ICRP section 3 response sheet
January 28th, 2008 ENR ICRP section 3 verification comments
January 28th, 2008 EC ICRP section 3 verification comments
January 28th, 2008 DFO ICRP section 3 verification comments
January 28th, 2008 DIAND ICRP section 3 verification comments
December 5th, 2007 WLWB filtered ICRP section 3 comment table
November 19th, 2007 DFO ICRP section 3 comments
November 19th, 2007 DIAND ICRP section 3 comments
November 19th, 2007 WLWB consultant ICRP section 3 comment
November 19th, 2007 NSMA ICRP section 3 comments
November 19th, 2007 ENR ICRP section 3 comments
November 19th, 2007 EC ICRP section 3 comments
November 19th, 2007 Agency ICRP section 3 comment table
November 16th, 2007 DIAND-Brodie ICRP section 3 review
November 8th, 2007 ICRP working group #2 meeting transcript
October 31st, 2007 WLWB ICRP section 2 advisory document
October 4th, 2007 Agency letter to WLWB re ICRP section 2 verification
September 14th, 2007 BHPB ICRP response table
September 14th, 2007 BHPB letter to DFO re fish in pit lakes
September 4th, 2007 BHPB letter to WLWB re summary table for ICRP
September 4th, 2007 EC comments on ICRP summary table
August 20th, 2007 WLWB consultant ICRP section 2 review
August 11th, 2007 WLWB letter to ICRP section 2 reviewers
August 11th, 2007 ICRP section 2 WLWB filtered comment table
July 27th, 2007 DFO ICRP section 2 comments
July 27th, 2007 ENR ICRP section 2 comments
July 18th, 2007 EC ICRP section 2 comments
July 7th, 2007 NSMA comments on ICRP section 2
July 4th, 2007 ICRP appendix g tables – pits, UG, waste rock v1
July 25th, 2007 LKDFN ICRP section 2 comment
July 4th, 2007 ICRP appendix F research summary tables v1
June 20th, 2007 BHPB letter to WLWB re ICRP appendix C
June 20th, 2007 BHPB ICRP appendix C table 21
May 25th, 2007 WLWB ICRP section 1 guidance letter
May 10th, 2007 BHPB verification comments
April 27th, 2007 GNWT comments on ICRP objectives
April 27th, 2007 DIAND comments on ICRP objectives
April 27th, 2007 BHPB comments on ICRP objectives
April 26th, 2007 EC comments on objectives structure
April 13th, 2007 WLWB letter to ICRP working group members
April 18th, 2007 BHPB response to ICRP section 1 comments
April 13th, 2007 WLWB filtered comment table ICRP section 1 comments
March 19th, 2007 ICRP section 1 commends NSMA
March 19th, 2007 ICRP section 1 comments GNWT
March 19th, 2007 ICRP section 1 comments DIAND
March 19th, 2007 ICRP section 1 comments Gartner Lee Ltd.
March 19th, 2007 ICRP section 1 comments Enviro Canada
March 19th, 2007 ICRP section 1 comments DFO
February 5th, 2007 BHPB invitiation to interim closure and reclamation plan presentation
January 18, 2007 BHPB invitation to interim reclamation and closure plan information session Feb 5th 07
January 16th, 2007 letter from WLWB on receipt of interim reclamation and closure plan
January 15, 2007 Ekati Interim Reclamation and Closure Plan (CD only)
October 13th, 2006 Closure options review request oct 06
April 7 to September 28 2006 BHPB letters to DIAND re security
September 15th, 2006 GNWT – DIAND letter on closure options workshop
September 5th, 2006 NSMA letter to BHPB re Interim Closure and Reclamation Plan
September 13th, 2006 BHPB final Interim Closure and Reclamation Plan ToR
September 1st, 2006 BHPB letter re Interim Closure and Reclamation Plan
August 28th, 2006 BHPB letter on closure options evaluation
August 2nd, 2006 NSMA letter to BHPB re ICRP August 2006
1999 BHPB pit filling no net loss of habitat document Tailings Management and Wastewater
2012-01-19 – BHPB to AANDC re: Cell E (1616-30) 2011 Pumping Summary
2011-12-16 – BHPB to Agency re: Nitrate WQO
2011-11-08 – BHPB to AANDC re: King Pond 2011 Pumping Summary
May 8th 2009, DIAND Letter to BHPB re: Daily Inspections of the LLCF
April 17th 2009, Letter from WLWB re: Board Decision on BHPB Update to WWPKMP
January 30th, 2009 WLWB Comment Summary Table re BHPB WWPKMP
December 15, 2008 – BHPB Letter re Update to Wastewater and PKMP
November 7th, 2008 BHPB Letter to Agency LLCF Water Quality Model
July 23rd, 2008 BHPB comments on review of its LLCF water quality model
June 30th, 2008 ecometrix review of LLCF models 1 and 2
June 30th, 2008 comment table on LLCF models
June 20th, 2008 DIAND letter to WLWB re LLCF water quality models 1 and 2
April 15th, 2008 BHPB cover letter re LLCF water quality study
November 30th, 2007 WPKMP update comment table
September 3rd, 2007 DIAND review of processed kimberlite pore water quality study
August 31st, 2007 Ekati wastewater and processed kimberlite management plan update
May 31st, 2007 Cell D deposition of wastewater into LLCF
August 3rd, 2006 WLWB letter re chloride use
August 3rd, 2006 WLWB letter to BHPB re Chloride Use
September 12th, 2006 Wastewater Processed Kimberlite Management Plan Decision
July 14th, 2006 BHPB response to reviewer comments on tailings and wastewater management Waste Rock Management Plan and Seepage Monitoring
April 24th, 2009 WLWB Letter re: 2008 Waste Rock and Waste Rock Storage Area Seepage Survey Report
September 16th, 2008 WLWB board package – 2007 WRSA report
June 30th, 2008 ENR review of waste rock seepage survey
July 2nd, 2008 waste rock seepage report review comment table (questions only)
June 30th, 2008 EC review of 2007 waste rock seepage survey
April 15th, 2008 BHPB letter to WLWB re 2007 seepage report
December 20th, 2007 WLWB approval letter – expansion of waste rock pile
November 28th, 2007 BHPB letter to WLWB re waste rock storage pile expansion
November 9th, 2007 BHPB tundra soil study comment table
November 2nd, 2007 ENR comments – tundra soil study
November 1st, 2007 DIAND letter to WLWB re tundra soil study
October 29th, 2007 BHPB letter to increase size of waste rock pile
September 28th, 2007 BHPB letter to WLWB re tundra soil study
September 4th, 2007 BHPB letter re release of 2007 seepage report
May 31st, 2007 BHPB letter on freezing of WRSA
May 2007 BHPB rock sampling information
January 22nd, 2007 BHPB letter re 2006 waste rock seepage survey report
December 19th, 2006 WLWB approval of 2005 waste rock storage area seepage survey report
August 22nd, 2006 spring waste rock seepage report cover letter
June 2nd, 2006 BHPB response to seepage report comments Water Licence MV2003L2-0013 and MV2001L2-0008 (plus land use permits)
May 8th 2009, WLWB Letter re: Water Quality Objectives for Ammonia, Zinc and Nitrate
April 27th 2009 WLWB Table of Draft Changes to SNP for SPB Water Licence
April 27th 2009 WLWB Table for reviewer Comments on SPB Draft Water Licence
April 27th 2009 WLWB Table of Conditions not used in Draft SPB Water Licence
April 27th 2009 WLWL Draft Water Licence for Sable Pigeon Beartooth
April 27th 2009 WLWL Letter to Reviewers for SPB Draft Water Licence
March 26th, 2009 – BHPB SPB Renewal Undertaking
March 20th, 2009 – WLWB Decision re INAC Undertaking from SPB Public Hearing
March 11th, 2009 – SPB Public Hearing Transcript (Day 2)
March 11th, 2009 – SPB Public Hearing Transcript (Day 1)
March 10th, 2009 – BHPB Letter to WLWB re SPB Public Hearing Undertakings
February 24th, 2009 – Agenda for SPB Public Hearing 4-5th March 2009
February 20th 2009 – BHPB SPB Intervention Presentation for Public Hearing
February 10th, 2009 BHPB Response to January 26 Information session re SPB
January 16, 2009 – BHPB letter to WLWB re SPB 2009 Information Package
January 5, 2009 – BHPB Invitation to Information Session SPB
November 21, 2008 – WLWB Revised Wastewater PK Management Plan
November 18th, 2008 BHPB Letter to WLWB re Update to Spill Contingency Plan
November 7, 2008 – WLWB Board Directive SPB Technical Information Request
November 5, 2008 – Transcript for SPB Technical Sessions
November 4, 2008 – BHPB Presentation SPB Amalgamation
October 3rd, 2008 SPB reasons for decision
October 3rd, 2008 WLWB notice of SPB technical sessions
September 24th, 2008 WLWB flowchart of SPB process options
September 24th, 2008 WLWB letter to BHBP re SPB amalgamation
August 29th, 2009 BHPB response to comments on SPB water licence renewal
August 6th, 2008 DFO comment on SPB water licence
July 14th, 2008 BHPB response to water licence amalgamation
June 30th, 2008 Joint governments letter on amalgamation of water licences
May 16th, 2008 BHPB response to comments on licence amalgamation
June 3rd, 2008 WLWB decision on exemption from water licence screening
April 30th, 2008 WLWB hearing notice for Sable, Pigeon and Beartooth
April 18th, 2008 GNWT letter to WLWB re water licence amalgamation
April 14th, 2008 Governments joint letter to WLWB re licence amalgamation
April 9th, 2008 WLWB letter to BHPB re land use permits for Sable, Pigeon and Beartooth
February 20th, 2008 EC comments on water licence renewal
February 7th, 2008 BHPB discussion paper on 008 licence
February 6th, 2008 BHPB Sable, Pigeon and Beartooth licence comments from BHPB
January 2008 Ecometrix clarification comments on chloride for 008 licence
January 18th, 2008 DIAND clarification on chloride for 008 licence
January 17th, 2008 Zajdlik comments regarding chloride for 008 licence
December 10th, 2007 DFO letter to BHPB re amendment to the Sable, Pigeon and Beartooth fisheries authorization
November 19th, 2007 BHPB response to comments on chloride criterion
April 15th, 2008 BHPB letter to WLWB re 2007 seepage report
October 10th, 2007 WLWB water licence chloride study
April 25th, 2007 EC chloride comments
April 24th, EC and DFO preliminary comments on chloride
April 23rd, DIAND comments on chloride
April 20th, 2007 NSMA chloride comments
April 3rd, 2007 WLWB decision on road watering
February 6th, 2007 review of chloride discharge criteria for sable development
February 4th, 2007 WLWB public hearing notice for road watering licences amalgamation
December 19th, 2006 WLWB letter to BHBP re amalgamation of road watering licences with type A licences Water Licence W2009L2-001 (Amendment of MV2003L2-0013)
June 25th, 2009 WLWB Reasons for Decision for Water Licence W2009L2-001
June 25th, 2009 WLWB Leeter to the Minister re: W2009L2-001
June 24th, 2009 Water Licence W2009L2-001 Wildlife Effects Monitoring Program
2012-03-29 – GWNT to Agency re: Regional grizzly bear monitoring program IEMA info request
2011-12-23 – BHPB to Lutsel K’e Dene FN re Caribou Mortality at EKATI Airport
2011-12-12 – BHPB to GNWT re: Grizzly Bear Hair Snagging Monitoring Program Response
April 29th 2009, BHPB Letter to Agency re: Changes to 2009 WEMP
March 20th, 2009 BHPB 2008 WEMP Letter
March 10th, 2009 Ekati WEMP Review BHPB
February 2nd, 2009 BHPB Withdrawal from 2009 Wolverine DNA Study
October 24th, 2008 – ENR Review of BHPB 2007 WEMP
April 14th, 2008 NSMA letter to GNWT re wildlife research permit
April 2nd, 2008 GNWT letter to BHPB re wildlife research permit
April 1st, 2008 GNWT letter to BHPB re wildlife research permit
October 29th, 2007 NSMA request for agencies to review wildlife permits
Research paper – April 2008 Belanger/Mulders DNA report
September 5th, 2007 NSMA comments on WEMP 2006
May 4th, 2007 ENR letter to BHPB re wildlife research permit
April 25th, 2007 BHPB letter to ENR re widlife research permit
February 13th, 2007 Technical review of Macdonald/Gunn wildlife report
August 30th, 2006 BHPB cover letter re caribou and roads 2005 report

Other Correspondence

Aquatic Effects Monitoring Program (AEMP)
2009-02-18 – BHPB to DFO re: 2007 Nero-Nema & Panda Diversion Channel Monitoring Program Reports
October 1st, 2008 Purpose, Objectives, Outcomes of AEMP workshop
September 18th, 2008 WLWB decision BHPB 2007 AEMP
October 1st, 2008 DIAND AEMP guidelines workshop agenda
September 1st, 2008 Macdonald/Zajdlik AEMP guidelines overview v4
June 30th, 2008 ecometrix review of koala watershed
September 17th, 2008 WLWB decision package, 2007 AEMP
June 2008 Ecometrix review of AEMP 2007
June 2008 Jacques Whitford Review of BHPB Watershed Adaptive Management Plan
June 26th, 2008 AEMP comment table (questions only)
June 20th, 2008 NSMA comments on 2007 AEMP
June 20th, 2008 DIAND comments on 2007 AEMP
June 20th, 2008 DFO comments on 2007 AEMP
June 2nd, 2008 AEMP 2007 comment table (questions only)
May 12th, 2008 ESSA review of Diavik and Ekati adaptive management plans
April 28th, 2008 consultant review report on Ekati and Diavik Adaptive Management Plans
April 30th, 2008 BHPB letter to WLWB re 2007 AEMP
December 4th, 2007 WLWB receipt of watershed adaptive management program
October 29th, 2007 NSMA comments on AEMP
August 10th, 2007 EC comments on AEMP sampling reduction
August 3rd, 2007 NSMA comments on AEMP sampling reduction
August 3rd, 2007 ENR comments on AEMP sampling reduction
August 3rd, 2007 DIAND comments on AEMP sampling reduction
August 2nd, 2007 DFO comments on AEMP sampling reduction
April 2007 AEMP 2007-09 joint comments table
April 19th, 2007 WLWB approval of AEMP 2007-09
March 1st, 2007 WLWB letter to BHPB re AEMP 2007-09
February 28th, 2007 GLL initial review of AEMP 2007-09
February 12th, 2007 DIAND review of 2007-09 AEMP Plan
December 31st, 2006 BHPB letter to WLWB AEMP review and proposed 2007-09 program
January 11th, 2007 AEMP 2007-09 review period
February 10th, 2007 NSMA comments on AEMP 2007-09 plan
December 14th, 2006 Zajdlik overview of proposed AEMP
December 31st, 2006 BHPB letter to WLWB re AEMP review and 2007-09 program
November 30th 2006 WLWB letter to BHPB re AEMP re-evaluation
October 19, 2006 BHPB letter to Agency re invitation to AEMP review General Documents
Environmental Management (Miscellaneous)
Traditional Knowledge (Miscellaneous)
Cumulative Effects Assessment
Environmental Assessment (Miscellaneous) Legislation & Guidelines (Miscellaneous)
Water Quality & Fish Habitat Other Northern Projects
Diavik Diamond Mine
De Beers (Snap Lake Project)